Wow its christmas again, i must be getting old it doesn't seem like 12 months has gone by, i hope you had a good xmas and lets hope next year isn't as bad as thay say its going to be. still christmas brings presents and look what my lovely wife got me a new lid not just any lid but a orange one Result!. I have also now got the funds to get most of the missing bits. On a different note i,ve been overhauling my tool box and buying some new tools this should help in the future
Tuesday, 30 December 2008
Sunday, 7 December 2008
Saturday, 30 August 2008
Rebuild
Saturday, 19 July 2008
Sunday, 13 July 2008
Paint Job
Sunday, 6 July 2008
Ready To Paint
Sunday, 29 June 2008
Wet flat
Sunday, 1 June 2008
Dropped
Its been along time since i put an update on but things never go how they are supposed to. First scootrs have let me down on the headset and my wife got her way and i had to fit a new kitchen which swallowed all my spare time and left us broke!. I have had a rethink and have decided to shelve the drops and rebox the s.i.p seat ( might do that next year ) instead i have ordered a bespoke trimmed seat from the scooter republic on ebay thay have kept intouch and even sent pictures of my finished seat before sending it to see if i'm happy, which i most definatley am. The engine has been finished and now ready to fit. Its now time to get on with the paint job
Saturday, 16 February 2008
Engine
I did this work a couple of weeks ago but not had time to do the blog, anyway, the bits came to finish the engine. The casings have had the inlet modified and milling to match the malossi kit, then they were rubbed down, etch primed and painted jet black.
I put the gearbox together with the new cruciform and selector shaft and t5 short 4th gear, not forgeting to check the shim gap. Then the malossi clutch plates were soaked in oil overnight then i put the clutch together with a polini straight cut gear up kit ( Maybe it would have been better to go for a cosa clutch but i already had the gear up and love the sound they make)
The casings were fitted with new bearings and seals then the christmas tree was put in followed by the main shaft with gears then the Mazzucchelli gas flow crank. New kick start stop buffers, kog and spring.
I then put the 2 halves of the casings together with a fresh gasket and bolted together using stainless steel nuts and washers. Checking that all moved freely and the crank run true. I slipped the clutch and torqued it up. Next on went the piston, studs, Cylinder and a modified pinasco head, then the stater plate, hp4 light flywheel, selector box, backplate, shoes and hub, the carb and cowlin are just resting on for the picture.
I am still waiting for the flywheel cover, it's coming with the headset from Scootrs. I have been given a date of 20th of this month. As soon as it arrives i will be able to get on with the paint job.
Sunday, 13 January 2008
Forks
A wet and windy day and not much to do except build the forks up. The disc went on ok but it did not come with a speedo drive, bolts to hold the calapor on or a seal curclip and d washer to attach it to the forks. The shocker is a sebac unit with a biturbo spring
Sunday, 6 January 2008
Pete Tong
Well it all went pete tong over the holidays. I was going to build my engine but a pattern cruciform wrecked the thread on the selector shaft and that was that, still, some of the items i ordered arrived. One being my disc brake, a grimeca semi-hydraulic classic from the scootercentre in germany with10% off, free post and a free t/shirt xl Result!!
Before Painting
After painting. I also made a stainless steel plate to cover the semi-hydraulic master cylinder. I have also ordered drop handle bars from scootrs they will probably take a while to arrive. I will have to wait till the end of the month before i can order the new (Genuine) parts for the motor and a lovely hard and probably uncomfy s.i.p race seat (Looks before comfort)
Subscribe to:
Posts (Atom)